To add a level or floor in Revit, 


you must first open one of the default elevation points etc  (North, South, East, West).

How to add level in Revit, vRv29, How to add floor in Revit

How to add levels in Revit



Here you will find the default 2 levels,  level 1 and level 2



Now you have to go to datum in architecture teb and select level
How to add level in Revit, vRv29, How to add floor in Revit

How to add floors in Revit



After that above level 2, you need to draw a required levels or floors.

After that set the height of each level

After setting the height, the level or floor add work in your project is complete..